Meyers Earthwork - Select Material Stockpile Adjacent to Red Bluff Diversion Dam Project

Stockpile location adjacent to Red Bluff Diversion Dam
Prime Contractor: 
Location: 
Period of Performance: 
November, 2011 to January, 2012
Project Description: 

As a subcontractor on this project, ADH is providing expert surface water quality assistance and monitoring to this NPDES Risk Level 2 project adjacent to the Sacramento River.  The project consists of placement, storage, separation and removal of select material that originated from the adjacent Red Bluff Diversion Dam project.  The staged material has been excavated from a cofferdam protected area below the waterline for installation of a water diversion facility in the Sacramento River.

ADH is providing compliance assistance through the Stormwater Multiple Applications and Report Tracking System (SMARTS) submission procedure, providing Stormwater Pollution Prevention Plan (SWPPP) development and field inspections, and providing expert consultation on field conditions and development of Best Management Practices (BMPs) for adequate water quality protection.