Industrial General Permit Requirements and Solutions

Requirements (New Requirements for Fall 2011)     See Solutions »

  • Permit implementation requires businesses to have State certified :
    • Qualified SWPPP Developer (QSD)
    • Qualified SWPPP Practitioner (QSP)
  • Increased facility inspection frequencies and reporting
  • Increased stormwater runoff sampling, requiring specific protocols
  • Numeric Action Limits (NALs) and Numeric Effluent Limits (NELs)
  • Implementation of specific minimum BMPs; requires staff training
  • Electronic filing of all reports must be through the Stormwater Multiple Applications and Report Tracking System (SMARTS)

Solutions

ADH Industrial General Permit Solutions

  • Preparation of Industrial Stormwater Pollution Prevention Plans (SWPPP) and updates
  • Comprehensive assistance in permit compliance and implementation of permit requirements
  • Provide experienced QSDs and QSPs for project coordination and implementation, inspections and BMP performance evaluations
  • Extensive experience in facility inspections, documentation, and reporting
  • On‐demand highly trained storm event sampling technicians, including specialized sampling equipment
  • Illicit discharge source detection and corrective action implementation and tracking of corrective action effectiveness
  • On‐site stormwater compliance training for staff and contractors on the proper implementation and maintenance of required BMPs
  • Submittal of Project Reporting Documents (PRDs) and data submittal for Legally Responsible Party (LRP) certification through the SMARTS system